The Government of Javier Milei announced the approval of the entry into the Incentive Regime for Large Investments (RIGI) of the Argentina LNG project, an energy initiative developed by YPF, Eni, and XRG that contemplates a total investment of USD 50.750 billion by 2050.
This is the largest investment announced in Argentine history, as highlighted by the Minister of Economy, Luis "Toto" Caputo, through his X account.
"NEW RIGI APPROVED! Argentina LNG USD 50.750 billion", Caputo published while announcing the decision of the Evaluating Committee. The project anticipates disbursements of USD 25.000 billion between 2027 and 2030, while the cumulative investment would reach USD 50.750 billion over the next decades.
Javier Milei and Horacio Marín.
The Argentina LNG Project
The initiative aims to develop a production, processing, transport, and export infrastructure for liquefied natural gas (LNG), focusing on the resources of Vaca Muerta.
According to the minister, it will allow the export of 12 million tons of LNG annually, in addition to natural gas liquids, with estimated revenues exceeding USD 9.000 billion per year.
To achieve these export levels, the development contemplates a production plateau of 65 million cubic meters of gas per day, a volume equivalent to more than 40% of Argentina's current production.
The planned infrastructure includes the construction of a gas pipeline and a multiproduct pipeline, each 524 kilometers long, intended to transport hydrocarbons from the production areas to the Atlantic coast of Río Negro. There, two floating liquefaction units will operate, allowing the gas to be processed for subsequent export.
President Javier Milei.
The plan also includes the installation of industrial complexes in Neuquén and Río Negro for the processing of gas and its liquids. In this way, the project will integrate different stages of the energy chain, from the extraction of resources in Vaca Muerta to their transformation and commercialization in international markets.
Another central aspect of Argentina LNG is its expected impact on employment. During the construction phase, it is estimated that 20,000 jobs will be created, with peaks of up to 40,000 jobs.
Once the facilities are operational, another 8,000 direct and indirect jobs related to the operation are projected.
Upon announcing the approval, Caputo congratulated the president of YPF, Horacio Marín, for the development of the initiative and thanked the work of the RIGI Committee.
"More investment, more production, more jobs, and more exports for Argentina", concluded the minister, highlighting the economic and energy scope of the project.